What we did
SD Cosmetics provided specialist repairs to a broad range of damaged surfaces during both the construction and post-handover phases. Our role was integral to ensure that final finishes met the strict quality standards expected by the contractor and the client. The team provided a number of services including surface repairs to internal and external cladding, concrete and floor rectification, and remedial work to bespoke joinery, panels, and other high-spec elements. We also touched-up and restored powder-coated frames and metalwork as well as restored doors and windows, providing decorative finishes to all these areas.
Results
Having maintained a consistent presence over 264 days to align with the evolving construction timeline and ensuring a timely handover phase, the SD Team achieved high client satisfaction with all final finishes meeting Bowmer & Kirland’s and standards, reinforcing SD Cosmetics Team’s reputation as a dependable partner for high-value, large-scale commercial developments.
The team worked around active construction zones while coordinating with multiple trades, which required flexibility and rigorous adherence to health and safety standards. Our team’s post-handover repair support ensured that TJ Morris received a defect-free facility ready for operational use. The project was delivered to deadline in coordination with the project handover milestones and over 500 individual surface issues were rectified with zero recalls.
Client Testimonial
“SD Cosmetics’ consistent quality, professionalism, and adaptability were key to the successful delivery of this flagship distribution centre. Their workmanship ensured we were able to present a polished, ready-to-operate facility to our client.” Site Manager, Bowmer and Kirkland.